|

After another successful cable pull, the crew cuts an 18 inch segment of the unused portion of the cable for testing purposes.
|

Cable reel trucks feeding the new cable on Route 138 in Canton.
|

Prior to the cable pull, the crew installs an aluminum sleeve to guide the new cable into the conduit.
|

The cable reels are running smoothly on Route 138 in Canton during the first cable pull.
|

An overview of the cable pulling set-up during the first cable pull along Route 138 in Canton.
|

The cable is officially being installed on Route 138 in Canton!
|

Now that the three lines are connected, the cable is ready for installation.
|

This is the cable pulling truck and is situated at the opposite end of the segment from the cable reels.
|

Columbia Road in Dorchester, note the Southeast Expressway in the background.
|

An overview of the Stoughton Switching Station.
|

Once the line is excavated, crews will then install the new cable from the Stoughton Switching Station to the first manhole.
|

W.A. Chester crews excavating the line from the Stoughton Switching Station to the first manhole on Route 138 in Stoughton.
|

The cable reels have arrived!
|

Cummins Highway at Caniff Monuments in Mattapan.
|

Cummins Highway at Caniff Monuments in Mattapan.
|

Cummins Highway at Caniff Monuments in Mattapan.
|
.jpg)
American Legion Highway near Austin Street in Boston.
|
.jpg)
American Legion Highway near Cantebury Street in Boston.
|

Looking west on Cummins Highway near Woodhaven Street in Mattapan.
|

Looking east on Cummins Highway near Woodhaven Street in Mattapan.
|

Looking south on American Legion Highway near Cantebury Street in Boston.
|

Rt. 128 / Rt. 138 Interchange on the northern side of the clover.
|

Rt. 128 / Rt. 138 Interchange on the southern side of the clover. Blue Hill is in the background.
|